TrueQty Academy · 29 guides · 39 min of video
Learn the whole job, one tender at a time.
Every task in TrueQty, written out as numbered steps with the video of it being done underneath. Start at chapter 0 and you will have watched a priced proposal being made in about 11 minutes. Or search for the one thing you need right now.
Your first priced proposal
From an empty workspace to a proposal your client can sign. Watch these in order the first time.
0:55CH 00TrueQty in 90 seconds
The whole job, start to finish, before you learn each step. Five drawings and two vendor price lists become a priced proposal, and every number traces back to a mark on a drawing.
0:41CH 01Sign in and find your way
Sign in, learn what each part of the sidebar is for, and open the Sample project so you can look around before you load a tender of your own.
0:48CH 02Create a project
Create one project for one tender. The building type and the number of floors you enter here are used later, so it is worth a minute to get them right.
0:48CH 03Upload the tender folder
Upload the whole tender folder in one go. TrueQty sorts every file, reads the floor and scale off each drawing, and one click reads them all. Floor layouts as PDF work best.
0:54CH 04While your drawings are read
What TrueQty does after you click Read drawings, and what is waiting for you when it is done: every drawing listed with its status, and the first check already run.
2:19CH 05Review a drawing
Check every device TrueQty counted, take out what is wrong, and add what it missed. A tick means a person checked it, never that TrueQty was sure.
0:57CH 06Approve counts
Approve a drawing: the named approval that puts its counts into the BOQ. It is a team lead's job, and the platform enforces that.
1:07CH 07Generate the BOQ
Turn the approved counts into a BOQ: a line for each device type on each floor, then everything those devices need, from cable to switches.
1:39CH 08Price the BOQ
Price every BOQ line from a vendor's quote for this tender or your saved price lists, add your markup, and leave what nobody quotes open, never guessed.
0:58CH 09Make the proposal
Turn the priced BOQ into a proposal your client can sign, at your sell price, as a PDF and an editable Word file, with your brand on the cover and every quantity traced.
Doing a real tender properly
Filing drawings, teaching it your consultant's codes, and every check and flag a real tender raises.
1:17CH 10File a drawing
Tell TrueQty what a drawing is, so its counts are filed in the BOQ under the right system and floor. It proposes each value and says where it read it.
1:58CH 11Teach it your consultant's codes
Teach TrueQty a consultant's tag codes, layers and symbols once, so every later drawing your firm reads comes in already typed. Change or remove anything you taught in Settings.
1:43CH 12The count check
Many consultants print their own device total on the drawing. TrueQty checks its count against it, drawing by drawing and for the whole project, and tells you in one line.
3:45CH 13Every warning, and what to do
A flag is TrueQty saying: look here. This is every warning it raises, what each one found, which ones block approval, and what to do about it.
1:27CH 14Typical floors
Make one drawing count for several identical floors. The multiplier is previewed, needs a team lead's approval, and always shows as a sum, never one unexplained number.
1:41CH 15Drawings with no legend
Count a drawing that has no legend, no layers and no labels. Point at one symbol, let TrueQty find every one like it, name the set, and add any it missed. A scan is counted by hand.
Cabling
The riser, the cable schedule and the values behind every cable length.
1:55CH 16The riser and the system view
File the riser, check what TrueQty read from it, and use the system view to see that the plans and the riser agree, rack by rack.
1:39CH 17The cable schedule
Read a cable schedule line by line: every device's run, with the working beside it, the 90 m copper check, and the cable to order in whole boxes.
1:14CH 18The cable standard
Set the eleven values behind every cable length on a project. Each follows the standard value until you set it, and every length is recalculated when you save.
Vendors and pricing
Price lists in, corrected and kept current, and the reasons behind every priced line.
2:24CH 19Add a vendor and a price list
Set up your categories, add a vendor with the currency they quote in, upload their price list with its expiry date, and check what TrueQty read before you rely on it.
2:01CH 20Check and correct a price list
Check a price list and correct anything the reader got wrong: a price, the stock, the currency, the expiry date, or a line it missed.
1:15CH 21Choose another vendor
See why each line priced the way it did, choose a vendor who is not the cheapest with a recorded reason, and check prices again when a vendor changes one.
1:28CH 22BOQ formulas, issue and export
See where every quantity on the BOQ comes from, check the figures add up, then issue it as a version that cannot change and export the client's copy and your costs to Excel.
Your brand and your rules
Your logo, your Word template, and the rules every bill in your firm is built with.
0:50CH 23Your logo on every proposal
Set the company name, colour, contact details and logo that every proposal goes out with. It takes about a minute, once.
0:59CH 24Your own Word template
Make proposals in your own Word design, with your letterhead, sections and terms. You add merge fields to your document, and TrueQty fills them with the same numbers.
1:38CH 25Your firm's BOQ rules
Set the rules every BOQ in your workspace is made with, apply a change to a BOQ you already have, and change a rule for one project only.
Your team
Who can do what, inviting people, the audit log, and the one-page checklist.
1:58CH 26Who checks, approves and prices
What each type of user can do in TrueQty, and why the approval is a team lead's. A junior can do all the work; a team lead puts their name to it.
1:23CH 27Invite your team, read the Activity log
Invite a colleague with the right role, look after invitations, roles and teams, and use the Activity log to see who changed a count or a price, and when.
0:49CH 28Your checklist, and your free trial
The whole job on one page, with a link to the guide for every step. Then try it on your own tender: 14 days free, no card.
The full film · 39:07
Prefer to watch it start to finish?
All 29 chapters as one film. Each guide above has its own chapter, so you can jump straight to the step that looks tricky.
The playlist on YouTubeThe best way to learn it is on your own tender.
Bring a real drawing and follow the guides as you go. Stuck on something these do not cover? Ask an engineer.
