Skip to content

TrueQty Academy · 29 guides · 39 min of video

Learn the whole job, one tender at a time.

Every task in TrueQty, written out as numbered steps with the video of it being done underneath. Start at chapter 0 and you will have watched a priced proposal being made in about 11 minutes. Or search for the one thing you need right now.

Your progressKept in this browser

00/ 29 guides done

0028
Try

Part A10 guides · 11 min

Your first priced proposal

From an empty workspace to a proposal your client can sign. Watch these in order the first time.

  1. 0:55
    CH 00

    TrueQty in 90 seconds

    The whole job, start to finish, before you learn each step. Five drawings and two vendor price lists become a priced proposal, and every number traces back to a mark on a drawing.

  2. 0:41
    CH 01

    Sign in and find your way

    Sign in, learn what each part of the sidebar is for, and open the Sample project so you can look around before you load a tender of your own.

  3. 0:48
    CH 02

    Create a project

    Create one project for one tender. The building type and the number of floors you enter here are used later, so it is worth a minute to get them right.

  4. 0:48
    CH 03

    Upload the tender folder

    Upload the whole tender folder in one go. TrueQty sorts every file, reads the floor and scale off each drawing, and one click reads them all. Floor layouts as PDF work best.

  5. 0:54
    CH 04

    While your drawings are read

    What TrueQty does after you click Read drawings, and what is waiting for you when it is done: every drawing listed with its status, and the first check already run.

  6. 2:19
    CH 05

    Review a drawing

    Check every device TrueQty counted, take out what is wrong, and add what it missed. A tick means a person checked it, never that TrueQty was sure.

  7. 0:57
    CH 06

    Approve counts

    Approve a drawing: the named approval that puts its counts into the BOQ. It is a team lead's job, and the platform enforces that.

  8. 1:07
    CH 07

    Generate the BOQ

    Turn the approved counts into a BOQ: a line for each device type on each floor, then everything those devices need, from cable to switches.

  9. 1:39
    CH 08

    Price the BOQ

    Price every BOQ line from a vendor's quote for this tender or your saved price lists, add your markup, and leave what nobody quotes open, never guessed.

  10. 0:58
    CH 09

    Make the proposal

    Turn the priced BOQ into a proposal your client can sign, at your sell price, as a PDF and an editable Word file, with your brand on the cover and every quantity traced.

Part B6 guides · 12 min

Doing a real tender properly

Filing drawings, teaching it your consultant's codes, and every check and flag a real tender raises.

  1. 1:17
    CH 10

    File a drawing

    Tell TrueQty what a drawing is, so its counts are filed in the BOQ under the right system and floor. It proposes each value and says where it read it.

  2. 1:58
    CH 11

    Teach it your consultant's codes

    Teach TrueQty a consultant's tag codes, layers and symbols once, so every later drawing your firm reads comes in already typed. Change or remove anything you taught in Settings.

  3. 1:43
    CH 12

    The count check

    Many consultants print their own device total on the drawing. TrueQty checks its count against it, drawing by drawing and for the whole project, and tells you in one line.

  4. 3:45
    CH 13

    Every warning, and what to do

    A flag is TrueQty saying: look here. This is every warning it raises, what each one found, which ones block approval, and what to do about it.

  5. 1:27
    CH 14

    Typical floors

    Make one drawing count for several identical floors. The multiplier is previewed, needs a team lead's approval, and always shows as a sum, never one unexplained number.

  6. 1:41
    CH 15

    Drawings with no legend

    Count a drawing that has no legend, no layers and no labels. Point at one symbol, let TrueQty find every one like it, name the set, and add any it missed. A scan is counted by hand.

Part C3 guides · 5 min

Cabling

The riser, the cable schedule and the values behind every cable length.

  1. 1:55
    CH 16

    The riser and the system view

    File the riser, check what TrueQty read from it, and use the system view to see that the plans and the riser agree, rack by rack.

  2. 1:39
    CH 17

    The cable schedule

    Read a cable schedule line by line: every device's run, with the working beside it, the 90 m copper check, and the cable to order in whole boxes.

  3. 1:14
    CH 18

    The cable standard

    Set the eleven values behind every cable length on a project. Each follows the standard value until you set it, and every length is recalculated when you save.

Part D4 guides · 7 min

Vendors and pricing

Price lists in, corrected and kept current, and the reasons behind every priced line.

  1. 2:24
    CH 19

    Add a vendor and a price list

    Set up your categories, add a vendor with the currency they quote in, upload their price list with its expiry date, and check what TrueQty read before you rely on it.

  2. 2:01
    CH 20

    Check and correct a price list

    Check a price list and correct anything the reader got wrong: a price, the stock, the currency, the expiry date, or a line it missed.

  3. 1:15
    CH 21

    Choose another vendor

    See why each line priced the way it did, choose a vendor who is not the cheapest with a recorded reason, and check prices again when a vendor changes one.

  4. 1:28
    CH 22

    BOQ formulas, issue and export

    See where every quantity on the BOQ comes from, check the figures add up, then issue it as a version that cannot change and export the client's copy and your costs to Excel.

Part E3 guides · 3 min

Your brand and your rules

Your logo, your Word template, and the rules every bill in your firm is built with.

  1. 0:50
    CH 23

    Your logo on every proposal

    Set the company name, colour, contact details and logo that every proposal goes out with. It takes about a minute, once.

  2. 0:59
    CH 24

    Your own Word template

    Make proposals in your own Word design, with your letterhead, sections and terms. You add merge fields to your document, and TrueQty fills them with the same numbers.

  3. 1:38
    CH 25

    Your firm's BOQ rules

    Set the rules every BOQ in your workspace is made with, apply a change to a BOQ you already have, and change a rule for one project only.

Part F3 guides · 4 min

Your team

Who can do what, inviting people, the audit log, and the one-page checklist.

  1. 1:58
    CH 26

    Who checks, approves and prices

    What each type of user can do in TrueQty, and why the approval is a team lead's. A junior can do all the work; a team lead puts their name to it.

  2. 1:23
    CH 27

    Invite your team, read the Activity log

    Invite a colleague with the right role, look after invitations, roles and teams, and use the Activity log to see who changed a count or a price, and when.

  3. 0:49
    CH 28

    Your checklist, and your free trial

    The whole job on one page, with a link to the guide for every step. Then try it on your own tender: 14 days free, no card.

The full film · 39:07

Prefer to watch it start to finish?

All 29 chapters as one film. Each guide above has its own chapter, so you can jump straight to the step that looks tricky.

The playlist on YouTube
TrueQty Academy/Full film

The best way to learn it is on your own tender.

Bring a real drawing and follow the guides as you go. Stuck on something these do not cover? Ask an engineer.

Start free trialBring a real drawing. 14 days free, no card.