  1. 01Eleven values
  2. 02Standard until you set them
  3. 03Save and recalculate
  4. 04Back to the standard

The eleven values

Every length in the schedule is built from the cable standard for this project:

  1. Plan scale (1:n)
  2. Routing factor
  3. Device drop height
  4. Slack, device end
  5. Slack, rack end
  6. Maximum horizontal run
  7. Floor-to-floor height
  8. Backbone slack, each end
  9. Waste
  10. Copper box length
  11. Containment fittings

Each one is tagged Standard value until you set it, then Project value.

Step by step

  1. On the project page, open the Racks and cables tab, and find Cable standard, just above the cable schedule. It shows how many values are set, such as 0 of 11 values set for this project.
  2. Click Show and edit the values.
  3. Type the value your firm uses. Say you allow 20% for trays and bends, not 15%: type 1.2 in Routing factor.
  4. Click Save and recalculate lengths. Every length in the cable schedule is recalculated. To bring the new lengths into a BOQ you already have, make a new version of it. The message says Saved. All cable lengths were recalculated., with Undo. Discard changes puts back what you typed before saving.

Check it worked

The line reads 1 of 11 values set for this project, and the other ten still follow the standard. On the sample tender, one run went from 34.59 m to 35.77 m, and the order went to 28 boxes.

Back to the standard

Click Use standard value beside the value, then save. A value you have not set always follows the standard.

Who can change it

A junior, a team lead or an admin. Anyone else sees Show the values and can read them. A read-only seat can read them too, but not change them.

Watch it done

Open on YouTube

The same steps, on the sample tender, in 1:14.

TrueQty Academy/CH 18/The cable standard

Finished this guide?

Mark it done to track your way through the Academy.

Follow along on your own tender. Every guide works the same on a real drawing.

Start free trial