Set the rules every BOQ in your workspace is made with, apply a change to a BOQ you already have, and change a rule for one project only.

Who can do this
Team leadAdmin

In this guide

  1. 01Rules on every BOQ
  2. 02Settings, BOQ rules
  3. 03A new version to apply
  4. 04Per-project overrides

A BOQ with no riser and no cable schedule works out its cabling, patch panels and switches from a short list of rules. Open Rules used, on the BOQ page, to see the ones this version was made with. A one-floor project might get two 48 port switches.

Change a rule for the whole firm

  1. Open Settings, then BOQ rules. From the BOQ page, Rules used, then Firm rules in Settings, opens the same place. Only an admin can change the firm rules.
  2. Read each rule. Under its name it says Standard value: your firm has not set this rule, or that it is set by your firm, with the standard value beside it.
  3. Type your value and click Save rules. Say your firm uses 24 port switches: type 24 in Ports per access switch. Use standard value puts a rule back, with Undo.

Apply it to a BOQ you already have

A change applies to BOQs made from now on. A BOQ you already have keeps its rules, and Rules used says how many rules changed since that version.

  1. Click Make a new version, there or in More. A draft is replaced, not stacked, and keeps its version number, unless a proposal was made from it. An issued version stays as it is, and the new one takes the next number. Rates are kept where they can be.
  2. Check the line. On the sample, the switch line becomes three 24 port switches.

Route length per floor

The one you will change most often. It is on All lines.

  1. Under Route length per floor, type a length for the floor, such as 40 m.
  2. Press Enter or click Save. It says Saved, and the cable works out again straight away, such as from 1,584 m to 2,112 m. Any rates you have entered are kept. Esc puts back the saved length.

When the cable lengths come from the cable schedule, the BOQ says so under Cable lengths instead. Change them in Racks and cables, then make a new version.

One project different from the rest

  1. On the project page, click Change rules for this project only, under Project rules. More, then Rules for this project, on the BOQ page opens the same page.
  2. Change the rule. It applies to this project only, and the rule reads Project value, with the firm value beside it.
  3. Use firm value puts it back. Every other project keeps the firm rules.

Project rules are a team lead's or admin's job. A change does not alter a BOQ already made: make a new version to use it.

Device allowances: what each device brings with it

Every other system is priced from your firm's own allowances, such as so many metres of speaker cable per speaker, or a cabling point per access-control device. TrueQty sets none.

  1. Open Settings, then Device allowances. Only an admin changes them.
  2. Add one:
    • choose the Device;
    • name the Item billed as the BOQ line should read, such as "Speaker cable, 2 core 1.5 mm² FR";
    • type how much one device takes Per device, in m or each;
    • type the Waste %.
  3. Or add from a consultant BOQ. Under Add from a consultant BOQ: confirmed candidates, Add these puts a system's cabling and containment points on your list: one per device, the count itself, as GCC consultants bill them. The cable metres and containment go in your rate for the point. Items the drawings never show, such as a GI box per floor distributor, say to confirm them with your engineers first.
  4. Click Save allowances. The next BOQ you make uses them.

Each allowance applies to every count of its device, counted by TrueQty or by hand. It becomes a line per floor, and How this was worked out shows the count and your figure, such as "Your allowance: 8 ceiling-mounted speakers x 15 m, x 1.10". A device with no allowance brings nothing with it, and the BOQ says so under Counted, with no materials derived.

Watch it done

Open on YouTube

The same steps, on the sample tender, in 1:38.

TrueQty Academy/CH 25/Your firm's BOQ rules

Finished this guide?

Mark it done to track your way through the Academy.

Follow along on your own tender. Every guide works the same on a real drawing.

Start free trial