How to handle typical floors: one drawing for many identical floors

Make one drawing count for several identical floors. The multiplier is previewed, needs a team lead's approval, and always shows as a sum, never one unexplained number.

Who can do this
JuniorTeam leadAdmin
Read first

In this guide

  1. 01One sheet, many floors
  2. 02A preview first
  3. 03A team lead approves
  4. 04Shown as the sum

Towers repeat. A consultant often issues one drawing for many identical floors: "typical floor, levels 3 to 14". Do not upload it twelve times.

Step by step

  1. Open the drawing, and click Typical floor and teaching TrueQty at the foot of Check each device type. Under Does this drawing cover several floors?, click Mark as typical floor. If the drawing title already names the floors, TrueQty offers them, and you can click Edit first to change them.
  2. Enter the Number of floors, such as 12, and Which floors, such as Levels 3 to 14.
  3. Read the preview. It shows the effect, such as 86 devices × 12 floors = 1,032 devices.
  4. Click Save. Nothing is multiplied yet: the panel says Not applied yet, and the counts still include the drawing once.
  5. A team lead or an admin clicks Approve floor count. The panel turns green.
  6. Approve the drawing's counts again. Approving the floor count changes the quantities, so it removes the drawing's approval. See Approve a drawing.

Check it worked

The green panel reads This drawing covers several floors (typical floor), with the sum written out: 86 devices × 12 floors = 1,032 devices in the counts. BOQ by floor, on the BOQ and prices page, counts the drawing once for each floor it stands for. See Reading BOQ by floor.

Why it needs an approval

A multiplier changes the quantities a lot, so it is a team lead's decision, with their name on it. Saving it is not applying it.

Undoing it

If the drawing is not typical after all, click Count once only. Before the floor count is approved it goes back at once, with Undo. After approval, TrueQty asks first, because the counts in the BOQ drop back to one floor.

Watch it done

Open on YouTube

The same steps, on the sample tender, in 1:27.

TrueQty Academy/CH 14/Typical floors

Finished this guide?

Mark it done to track your way through the Academy.

Follow along on your own tender. Every guide works the same on a real drawing.

Start free trial