How to approve a drawing's counts (team lead)

Approve a drawing: the named approval that puts its counts into the BOQ. It is a team lead's job, and the platform enforces that.

Who can do this
Team leadAdmin

In this guide

  1. 01Every count checked
  2. 02The checklist
  3. 03A named approval
  4. 04Counts in the BOQ

Step by step

  1. Check every device type on the drawing first. See Review a drawing.
  2. Look at Approve this drawing, at the bottom of the left column. Its checklist shows what still stands between this drawing and the BOQ, such as 3 of 5 device types checked. When every line is ticked, the drawing is ready.
  3. Click Approve counts. It says above the button what happens: Approving puts these devices in the BOQ under your name. Your name and the date are recorded against the drawing.
  4. Approve every floor layout in the project. The steps at the top of the project page keep count, such as Now: 3 of 5 floor layouts approved. Then the BOQ can be made.

Check it worked

The panel reads Approved, marked In the BOQ, with your name and the date. Go to BOQ and prices takes you on. If other drawings are still to approve, it says how many.

If you are a junior

You do not see Approve counts, and that is correct: only a team lead or an admin can approve. The panel is called Hand this drawing over instead. Check and correct the counts, then click Send to team lead. The drawing shows as Waiting for approval on the project page. A count that goes into a tender should carry a senior person's name.

If a count changes after it is approved

An approved drawing opens read-only. The first change you try asks Edit an approved drawing?, and runs only after you click Edit counts. Changing a count removes the approval, and the drawing needs approving again. Read again does the same. That way a number in the BOQ is always the number someone approved.

If the checklist will not clear

The checklist names what is left: device types still to check, a device type counting zero with a note against it, or a drawing where nothing was counted. Clear each line. See Every warning on a drawing.

Two kinds of drawing are not approved at all:

  • Needs a PDF. A CAD file cannot be shown here, so it cannot be checked or approved. Add a PDF of the same drawing. The PDF becomes the counted copy.
  • Kept as reference. A schematic or riser is never approved, because its devices are counted on the floor layouts. If the drawing is really a floor layout, click Count it as a floor layout.

A read-only seat

A read-only seat can open and look through every drawing, but cannot check, change or approve counts. The drawing says so once, at the top.