Skip to content
CH 00 · Part A: Your first priced proposal

TrueQty in 90 seconds: a tender, from drawings to a priced proposal

The whole job, start to finish, before you learn each step. Five drawings and two vendor price lists become a priced proposal, and every number traces back to a mark on a drawing.

Who can do this
Everyone
Read first
Nothing. Start here.

In this guide

  1. 01Drawings read and counted for you
  2. 02You check every count
  3. 03The BOQ builds and prices itself
  4. 04A proposal in your own brand

The whole job, in six moves

An ELV tender lands on your desk: five drawings, two vendor price lists, due tomorrow. This is what TrueQty does with it.

  1. It reads every drawing and counts every device on it, for you to check. Floor plans and the riser go in together.
  2. You check the counts. One category at a time, with each device circled where the consultant drew it. Nothing is counted on trust.
  3. It flags what looks wrong. A camera the consultant labelled but never drew is flagged, and you add it by hand.
  4. A team lead approves. Only a named team lead or admin can approve a drawing's counts, and their name goes on it.
  5. The BOQ builds itself, cabling and all, from the approved counts, the riser and the cable schedule. Then it is priced line by line from your own vendors' quotes or price lists, with your markup on top.
  6. The proposal comes out in your brand, as a PDF and an editable Word file.

Every number in the proposal traces back to a mark on a drawing, with a person's name against it.

Where to go next

Part A walks through your first priced proposal in nine short guides, about twelve minutes of video in all. Start with Sign in and find your way, and watch them in order the first time.

Watch it done

Open on YouTube

The same steps, on the sample tender, in 0:55.

TrueQty Academy/CH 00/TrueQty in 90 seconds

Finished this guide?

Mark it done to track your way through the Academy.